CURRENT PROJECTS
PROJECT DETAILS
- Client : MAJID AL FUTTAIM
- Location : Dubai, UAE
- Duration : 6 Months
SCOPE
Supply and installation of complete MEP services. The main entrance ceiling was created above the escalator with Barisol stretched fabric, and huge lamps suspended from the roof. Also a huge steel frame and internally to create amazing lighting beacons.